Wednesday, November 5, 2025
e

Cabinet approves Rs 12,031-Cr Green Energy Corridor scheme

Subscribe to YouTube Channel

Subscribe to Mojo4Industry YouTube Channel and get Latest Industry Updates. Do press Bell Icon to get automated notifications whenever new video is uploaded.

Must Read

ABB Names Cloudworx as Winner of ABB Startup Challenge India 2025

ABB Names Cloudworx as Winner of ABB Startup Challenge India 2025 ABB India, in partnership with Microsoft and SynerLeap, announced...

Greaves Cotton Q2 FY26: Revenue Up 18%, Margins Improve 160 bps

Greaves Cotton Q2 FY26: Revenue Up 18%, Margins Improve 160 bps Greaves Cotton Limited, a leading diversified engineering company in...

Trinasolar presents Advanced BESS at Energy Storage Summit India

Trinasolar presents Advanced BESS at Energy Storage Summit India Trinasolar, a global leader in smart solar and energy storage solutions,...

Cabinet approves Rs 12,031-Cr Green Energy Corridor scheme

The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, approved the phase 2 of Green Energy Corridor (GEC) scheme for Intra-State Transmission System (InSTS) with estimated cost of Rs. 12,031.33 crore.

Around 10,750 circuit kilometres (ckm) of transmission lines and 27,500 Mega Volt-Amperes (MVA) transformation capacity of substations will be added under this scheme that will facilitate grid integration and power evacuation of approximately 20 GW of renewable energy (RE) power projects in Gujarat, Himachal Pradesh, Karnataka, Kerala, Rajasthan, Tamil Nadu and Uttar Pradesh.

The scheme will receive Central Financial Assistance (CFA) of 33% of the project cost i.e. Rs. 3,970.34 crore.  The transmission systems will be created over a period of five year from Financial Year 2021-22 to 2025-26.

This scheme is in addition to GEC-Phase-I which is already under implementation in Andhra Pradesh, Gujarat, Himachal Pradesh, Karnataka, Madhya Pradesh, Maharashtra, Rajasthan and Tamil Nadu for grid integration and power evacuation of approx. 24 GW of RE power and is expected to be completed by 2022. The scheme is for addition of 9,700 ckm of transmission lines and 22,600 MVA capacity of substations having estimated cost of transmission projects of Rs. 10,141.68 crore with Central Financial Assistance (CFA) of Rs. 4,056.67 crore.

 

Subscribe to our Newsletter

Keep up with the latest industry news by subscribing to our industry news update. This way, you'll always be in the know about what's happening in your field, and you can stay ahead of the competition.

- Advertisement - P1
Digital Vs Print Media
- Advertisement - P11
mojo program
- Advertisement - P12 -
content coalition
mojo4industry podcast episodes click here to listen

Tech Talks

ABB Names Cloudworx as Winner of ABB Startup Challenge India 2025

ABB Names Cloudworx as Winner of ABB Startup Challenge India 2025 ABB India, in partnership with Microsoft and SynerLeap, announced...

Greaves Cotton Q2 FY26: Revenue Up 18%, Margins Improve 160 bps

Greaves Cotton Q2 FY26: Revenue Up 18%, Margins Improve 160 bps Greaves Cotton Limited, a leading diversified engineering company in...
- Advertisement - P13